Excavation & earthwork / commercial
M Street
Commercial excavation, grading and earthwork, self-performed with GPS machine control and built to the numbers on the plan.
- Self-performed
- Our own iron and operators on every phase
- GPS machine control
- Model-driven cut and fill to survey tolerance
- Commercial only
- Developers, general contractors and owners
01 / Capabilities
Excavation and earthwork, from first cut to finished subgrade.
We work under one contract from mobilization to proof roll, so the grading, the drainage and the soil under the slab are one contractor's problem instead of three.
Mass excavation
Bulk cut and fill for building pads, parking fields and site infrastructure. Volumes are tracked daily against the model so the dirt balance closes on schedule.
Cut / fillStructural excavation
Footings, piers, elevator pits, utility trenches and retention. Benched and dewatered so the concrete crew finds a dry, true bottom.
Footings & pitsGrading & subgrade prep
Rough grade, fine grade and proof rolling to the geotechnical spec, with drainage shaped to move water off the pad rather than through it.
Rough & fine gradeUnsuitable soil management
Undercut, over-excavate, amend or haul off. Every load is ticketed and documented so the geotech can sign off without a second site visit.
Undercut & amendErosion control
Silt fence, inlet protection, tracking pads and temporary seeding, installed before the first cut and maintained through the wet months.
SWPPPClearing & demolition
Structure removal, pavement breaking and clean disposal, with the site left ready for the first pass of the dozer.
Site prep02 / Approach
Earth moved against a model, not against a hunch.
The research in our name is literal. Site surfaces are modeled, quantities are measured, and the grade is checked against coordinates at every stage.
Survey and model
We build the site surface from your civil plan before a machine moves, so every cut is driven by coordinates instead of a stake and a guess.
Close the dirt balance
Quantities are modeled against the geotechnical report. Import and export are priced before mobilization, not discovered at the end of the job.
Move and compact
GPS-guided dozers and excavators place the dirt, and every lift is compacted and tested against the spec as the work advances.
Verify and hand off
As-built grades, compaction records and a pad the next trade can walk onto. Documentation is delivered, not promised.
03 / Projects
Where the dirt moves.
Commercial site work only. That focus is why our crews, our equipment and our schedule are built for developer and general contractor timelines.
Industrial and warehouse pads
Large-format cut and fill, subgrade for tilt-up and slab-on-grade, and truck courts graded for drainage.
Retail and mixed-use sites
Tight urban footprints, structural excavation next to existing structures, and grading that keeps the site open to the public.
Multifamily and podium
Garage excavation, retention and backfill sequenced to the concrete schedule so the crane never waits on dirt.
Utility and infrastructure corridors
Trenching, bedding, backfill and restoration along roadways and site infrastructure, with traffic control coordinated.
Subgrade detail / compacted aggregate
04 site types
04 / Project intake
Send us the site. We will send back a number.
Every inquiry is read by the people who run the work. Expect a reply within one business day, and a takeoff-based proposal once we have seen the plans.
What to have ready
- Civil plans or a site plan showing the proposed grades
- Rough acreage and the building footprint
- Geotechnical report, if one has been issued
- Target start date and the bid due date
Plans are only used to price your work. We do not share project information with other contractors or owners.