Excavation & earthwork / commercial

M Street

Commercial excavation, grading and earthwork, self-performed with GPS machine control and built to the numbers on the plan.

Self-performed
Our own iron and operators on every phase
GPS machine control
Model-driven cut and fill to survey tolerance
Commercial only
Developers, general contractors and owners

01 / Capabilities

Excavation and earthwork, from first cut to finished subgrade.

We work under one contract from mobilization to proof roll, so the grading, the drainage and the soil under the slab are one contractor's problem instead of three.

01

Mass excavation

Bulk cut and fill for building pads, parking fields and site infrastructure. Volumes are tracked daily against the model so the dirt balance closes on schedule.

Cut / fill
02

Structural excavation

Footings, piers, elevator pits, utility trenches and retention. Benched and dewatered so the concrete crew finds a dry, true bottom.

Footings & pits
03

Grading & subgrade prep

Rough grade, fine grade and proof rolling to the geotechnical spec, with drainage shaped to move water off the pad rather than through it.

Rough & fine grade
04

Unsuitable soil management

Undercut, over-excavate, amend or haul off. Every load is ticketed and documented so the geotech can sign off without a second site visit.

Undercut & amend
05

Erosion control

Silt fence, inlet protection, tracking pads and temporary seeding, installed before the first cut and maintained through the wet months.

SWPPP
06

Clearing & demolition

Structure removal, pavement breaking and clean disposal, with the site left ready for the first pass of the dozer.

Site prep
Cut and fill to a designed pad / grade checked by model
Structural excavation / benched, dewatered, ready to pour

02 / Approach

Earth moved against a model, not against a hunch.

The research in our name is literal. Site surfaces are modeled, quantities are measured, and the grade is checked against coordinates at every stage.

01

Survey and model

We build the site surface from your civil plan before a machine moves, so every cut is driven by coordinates instead of a stake and a guess.

02

Close the dirt balance

Quantities are modeled against the geotechnical report. Import and export are priced before mobilization, not discovered at the end of the job.

03

Move and compact

GPS-guided dozers and excavators place the dirt, and every lift is compacted and tested against the spec as the work advances.

04

Verify and hand off

As-built grades, compaction records and a pad the next trade can walk onto. Documentation is delivered, not promised.

03 / Projects

Where the dirt moves.

Commercial site work only. That focus is why our crews, our equipment and our schedule are built for developer and general contractor timelines.

01

Industrial and warehouse pads

Large-format cut and fill, subgrade for tilt-up and slab-on-grade, and truck courts graded for drainage.

02

Retail and mixed-use sites

Tight urban footprints, structural excavation next to existing structures, and grading that keeps the site open to the public.

03

Multifamily and podium

Garage excavation, retention and backfill sequenced to the concrete schedule so the crane never waits on dirt.

04

Utility and infrastructure corridors

Trenching, bedding, backfill and restoration along roadways and site infrastructure, with traffic control coordinated.

Subgrade detail / compacted aggregate

04 site types

04 / Project intake

Send us the site. We will send back a number.

Every inquiry is read by the people who run the work. Expect a reply within one business day, and a takeoff-based proposal once we have seen the plans.

What to have ready

  • Civil plans or a site plan showing the proposed grades
  • Rough acreage and the building footprint
  • Geotechnical report, if one has been issued
  • Target start date and the bid due date

Plans are only used to price your work. We do not share project information with other contractors or owners.

No obligation. Your details are used only to respond to this inquiry.